
Our Start-to-Finish Build Program Is Booking Out FAST!


Inspection of your base steel reinforcement to verify compliance with NCC, AS2870 and structural engineering.

Inspection of your completed frame and base to verify compliance with NCC, AS1684, structural engineering and roof truss design.

Inspection of your home at lock-up stage completion to verify compliance with NCC, VBA guide to standards and tolerances and contract plans.

Inspection of your home just before plaster is to be installed to verify compliance with NCC, VBA guide to standards and tolerances and contract plans.

Inspection of your home's waterproofing system just before tiling starts to verify compliance with NCC, AS3740 and contract plans.

Inspection of your home once it has reached practical completion (PCI) to verify compliance with NCC, VBA guide to standards and tolerances and contract plans.

Camera inspection of your underground plumbing to ensure they are break-free and to comply with VBA: Foundation Maintenance Guide. Includes 2x hours on site with full drain clean, CCTV service, certificate of completion and a detailed report.

Inspection of your newly built home during your home maintenance period (usually 3, 6 or 12 months after your handover). We document and report any maintenance issues or defects that your builder needs to repair and rectify.

ABN: 85 637 964 339
Copyright 2024 © New Home Inspector Pty Ltd.